Welcome guest, Login

Home » Legals » Legals

Bid No. 8959 Domestic Water System – Shatzel to Williams Bowling Green State University Bowling Green, OH 43403 Bids Due: 2:00 PM local time, June 5, 2025; through the State’s electronic bidding system at https://bid express.com EDGE Participation Goal: 5.0% of contract Domestic steel use is required per ORC 153.011. Contract Estimated Cost General Contract $760,000 Alternate 1 – Phase 1A – Water extension to Williams Hall $299,000 Alternate 2 – Water removal in Tunnel for Phase 1A $7,700 Alternate 3 – Water pipe removal in Tunnel within Phase 1 $21,000 Alternate 4 – Lot 7A Resurfacing and parking stall restripe $27,600 Alternate 5 – Lot 7A Seal and Restripe $16,800 Alternate 6 – Sidewalk removal and replacement at Student Union $16,500 Alternate 7 – (5) Bollards Remove and Replace $15,500 Pre-bid Meeting: May 21, 2025, 9:00 a.m. – 10:00 a.m. at the following location: Central Services Building, Room 112 816 E. Poe Road Bowling Green, OH 43403 Walkthrough: A walkthrough of the project site is scheduled for May 21, 2025, immediately after the pre-bid meeting by no later than 10:00 a.m. until approximately 11:00 a.m. Meeting spot is Lot 7A in front of the Bowen-Thompson Student Union, 1001 E. Wooster Street, Bowling Green, OH 43403. Bid Documents: Available electronically at https://bid express.com. More Info: A/E contact: Travis Jay Eifert, EMH&T, Inc., Phone: 614-775-4615, E-mail: TEifert@emht.com May 14, 21, 28 '25


Return to previous page.